A high level estimate and action plan for a wastewater treatment lagoon has been developed.
Whites Beach Water Project – Engineer Update 10-6-2025
The watermain has been connected at Lapan road and 97% of watermain is installed. All
Whites Beach Sewer Project – Engineer Update 6-9-2025
Evaluation of potential sewer routes is ongoing. We continue to look for the most cost
Whites Beach Water Project – Engineer Update 6-9-2025
The contractor has approximately 1,600’ remaining of watermain to installed South of Bay Arenac Line
Standish Township secures water agreement with Bay County which will reduce monthly cost for Whites Beach.