A high level estimate and action plan for a wastewater treatment lagoon has been developed.
Whites Beach Water Project – Engineer Update 10-6-2025
The watermain has been connected at Lapan road and 97% of watermain is installed. All
A high level estimate and action plan for a wastewater treatment lagoon has been developed.