A high level estimate and action plan for a wastewater treatment lagoon has been developed.
Whites Beach Water Project – Engineer Update 10-6-2025
The watermain has been connected at Lapan road and 97% of watermain is installed. All
Phragmite Plants on Township Property at Whites Beach Rd/Lafave Rd to be Sprayed
Phragmites plants that are growing on the Township property at the corner of Whites Beach
